Opening for flats, Hastings
A 550 mm track-sawn straight edge then 180 mm stitch drilling, so bricklayers could start five blocks of flats the following week (for Modus Construction Consultants).
Our base is 4 William Road, St Leonards-on-Sea, along the coast from Bexhill.
A 550 mm track-sawn straight edge then 180 mm stitch drilling, so bricklayers could start five blocks of flats the following week (for Modus Construction Consultants).
Nine 100 mm holes through concrete ICF walls of a Passivhaus self-build (customer review, 30 Oct 2026).
21 holes of 255 mm, reaching about 6 m, through tarmac in one day in June 2023 (for Groundtech Consulting).
A 45° flue hole cored through a cavity wall in a couple of hours (customer review, 9 Feb 2026).
Nine 100 mm holes through concrete ICF walls for MVHR, heat pump pipework and services, on a Passivhaus self-build in St Leonards-on-Sea. Customer review, 30 October 2026.
We do not publish one. Call and we will talk it through.
Our Managing Director is Bailey Oliphant.
Short drive, quick quote. CHAS, Alcumas, PASMA, CITB SSSTS and SMSTS, and member of The Drilling & Sawing Association.
Bexhill-on-Sea, Brighton, Crowbrough, Eastbourne, Lewes, Newhaven, Rye, Seaford, Uckfield

















