In Chatham, a specialised project was completed to create a 1m x 1m access opening in a 160mm reinforced concrete (R/C) slab. The work was performed using a hand sawing method. To safely remove the cut concrete section, a 3-ton block and tackle system, mounted on an A-frame, was utilised. This precise operation was necessary to provide essential access to machinery situated on the floor below.